Total Datasets
15
Master datasets tracked
Data Received
100.0%
Avg. received from departments
Delivered to FWO
100.0%
Avg. delivered to FWO / consultant
Validated
0.0%
Avg. validated & accepted
Overall Completion
66.7%
Combined average across all stages
Master Dataset Registry
15 records
| Dataset / Sheet Name | Category | Received % | Delivered to FWO % | Validated % | Remarks | Attachments |
|---|---|---|---|---|---|---|
|
1
ML-I, ML-II, ML-III & Branch Lines ER Data
Engineering / Track
|
Data Collection | Done | Done | Pending | — | |
|
2
ML-I, ML-II, ML-III & Branch Lines Station Data, including classification of stations as Commercial and Non-Commercial
Traffic & Operations
|
Data Collection | Done | Done | Pending | — | |
|
3
Rolling Stock Data
Mechanical
|
Data Collection | Done | Done | Pending | — | |
|
4
ML-I Electric Data
Electrical
|
Data Collection | Done | Done | Pending | — | |
|
5
Electrical Power Assets Data
Electrical
|
Data Collection | Done | Done | Pending | — | |
|
6
Signaling Data of Divisions & Block Sections
Signal & Telecom
|
Data Collection | Done | Done | Pending | — | |
|
7
Tunnels Data
Civil Works
|
Data Collection | Done | Done | Pending | — | |
|
8
Bridges Data
Bridges / CEN-B
|
Data Collection | Done | Done | Pending | — | |
|
9
ML-I, ML-II & ML-III Level Crossings Data
P. Way / Safety
|
Data Collection | Done | Done | Pending | — | |
|
10
Track Machines Data
P. Way
|
Data Collection | Done | Done | Pending | — | |
|
11
Telecom Data
Telecom / DSTE
|
Data Collection | Done | Done | Pending | — | |
|
12
Time Tables
Operations / CPO
|
Data Collection | Done | Done | Pending | — | |
|
13
Trains Classification
Operations
|
Data Collection | Done | Done | Pending | — | |
|
14
Trains Composition
|
Data Collection | Done | Done | Pending | — | |
|
15
Tracks
|
Data Collection | Done | Done | Pending | — |